Project Manager:
Dipl.-Ing. Gregor Kücher
Priv.-Doz. Dipl.-Ing. Dr.mont. Stefan Luidold
This study is concerned with the elaboration of an alternative hydrometallurgical method for reconditioning of hard metal residues, which avoids the state of the art. Therefore a leaching step removes adhered coating material as the binder metal. For the remaining hard phase contingent a suitable treatment for reuse is sought. As a basis for the process development a kinetic research is performed in dependence of varying parameters, which discloses the limiting factors. Hence an efficient and effective process route will result thereby.
